Peru Water Distribution System Implementation Trip(3) - Joshua McMillan

Today was the day that we poured the concrete walls of the reservoir. We were not expecting such a high turnout of volunteers! Members of every household showed up to lend a hand. Todays task required people to gather aggregate and cement and place them inside the concrete mixer. After the everything was mixed, people would carry buckets full of concrete to the top of the reservoir scaffolding and then pour them inside the forms. Contractors with a gas operated vibrator would vibrate the concrete to make sure that there would be no air gaps in the wall as the concrete dried. After we finished pouring all the concrete, we had a big community feast where we ate cuy (guinea pig) with wheat rice and potatoes. A one of the community members brought a speaker so we took turns playing famous American and Peruvian songs. This day was a big milestone in the construction process and we were able to bond with the volunteers and contractors.


Concrete being mixed


 Pouring concrete into forms for wall

Comments

Popular posts from this blog

Welcome to the UC Davis Blum Center Blog!

Here you will find updates on our organization, and blog posts written by each of our Blum Fellows about their experiences abroad. Make sure to check out our website at blumcenter.ucdavis.edu, and like us on Facebook at www.facebook.com/UCDavisBlumCenter to get regular updates and see our upcoming events.

Manufacturing in Phnom Penh by Purva Juvekar

During winter and spring quarter 2017, my teammates and I (Team WASHOut) designed a sanitation station using a Biosand Filter. This was our effort towards providing clean water to students in floating schools on the Tonle Sap lake. We were provided with the opportunity to go to Cambodia and implement our project in person through the Blum grant, and we worked with Wetlands Work!, our clients for the senior design class. Figure 1 Rendering of Sanitation Station   We spent our time at UC Davis designing the station – sketches, CAD models, renderings, dimensions, engineering analysis and testing. We made a prototype in Davis, which we showed during the Senior Design Showcase in June, to test flow rates and water quality standards. The next step was to take the design to Phnom Penh and manufacture it there. We got to work as soon as we got there. My teammate and I were introduced to people on the WW! team who could help with translation, and we began scouting the city to fin...

Pedaling for Water in Kisumu: Closing, By Abe McKay

Pedaling for Water in Kisumu: Closing (3 of 3) 2017.09.12 In my second week in Kenya, I was back to visiting farmers, both with Vibrant Village and through other connections. However, I receive my biggest surprize in between site visits. I was walking with Ernest Kulali, a field officer and farmer from Vibrant Village, and he was telling me about the effectiveness of farming techniques. Using traditional methods, Ernest was getting 20kg of maize (corn) in a season from his shamba , his farm . When he switched to using purchased seeds and fertilizer, the same land produced 360 to 540kg of maize. What!? I had him run the numbers by me again, 20kgs → the range of 400kgs. I still didn’t believe it, but Nick the Vibrant Village director later agreed that farmers were seeing that magnitude of increase. Not just doubling their income/food supply, but a twenty-fold return! Further farming modifications will not yield as large a jump, but that sort of scale encouraged me that changing te...